ADHB Central Plant

Project Budget: $150 Million
Completion Date: Mid 2025
Location: Auckland CBD
Client / Builder: Auckland District Health Boad / McConnell Dowell

About the project:
The Central Plant Building (A40) at Auckland Hospital is a state-of-the-art, base-isolated facility designed for a 100-year lifespan. It ensures resilience against seismic events and other natural disasters, safeguarding critical infrastructure. A new 210m services tunnel connects essential hospital buildings, ensuring uninterrupted medical services in emergencies.

Stainless Steel Pipework
Seismic Bracing Systems
Pipe Clamps
Custom Bracketing
Seismic Anchors
Fasteners and Consumables
Seismic Design and Sign Off
Coatings Advice
Custom Fabrication
Project Support

Key Features:

  • Seismic Resilience – Base-isolated structure with triple friction pendulum bearings for enhanced earthquake protection.
  • Critical Infrastructure – Houses essential hospital services, including chilled water, medical gases, and emergency power.
  • Underground Services Tunnel – A 210m tunnel ensures uninterrupted supply connections between key hospital buildings.