CDC Hobsonville Campus – Auckland

Project Budget: –
Completion Date: Campus Two staged: first stage live 2024, certified for secure public cloud July 2025; stage 2.2 in delivery 2026
Location: 32-34 Westpoint Drive, Hobsonville, Auckland
Client / Builder: CDC Data Centres (Infratil-backed)

About the project:
Part of New Zealand’s first hyperscale data centre campuses. CDC’s Hobsonville Campus Two delivers 54 MW of operating capacity. This is the largest of CDC’s three Auckland sites, which together provide 220+ MW supporting national critical infrastructure. The sovereign, highly secure campus is built to Uptime Tier IV-grade resilience standards and has been net zero carbon certified since its first year of operation. Stage 2.2 continues the staged build-out of the campus.

TYCO DV-5a Pre-action Valve
Hanging Products
TYCO Nitrogen Corrosion Systems
Seismic Bracing
Valves
ModFrame Pumproom Supports
Valveset Manufacture and Testing
Orbital Fire Delivery
Product Advice and Support

Key Features:

  • 54 MW operating capacity – CDC’s largest Auckland campus.
  • Hyperscale data centre precinct – A part of New Zealand’s first hyperscale data centre precinct (220+ MW across Auckland).
  • Sovereign, high-security facility – Certified for national critical infrastructure workloads.
  • Net zero – Carbon certified since first year of operation.